City Bowl Development
- aspectlandarch
- Sep 24, 2020
- 1 min read
Updated: Apr 21, 2021


The Client required a Tree Survey of the site to establish and identify the trees that would be impacted by the extended development footprint as well as establish the proximity of the proposed residential units to existing mature trees.
Thereafter a Landscape Plan was compiled which represents the existing soft and hard landscaping infrastructure that exists and therefore may be referred to as a comprehensive landscape audit of the existing.
Comments